Jam Black Brook Culvert Replacement in Searsmont, Maine
-
This project will remove two improperly placed culverts and replace them with a single, bottomless arch culvert to allow brook trout and Atlantic salmon to access over 10 miles of high quality habitat in Jam Black Brook. It will also improve angling opportunities in Jam Black Brook and the St. Georges River.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Relocation of an Unnamed Sea-Run Brook Trout Stream, Maine
-
This project seeks to reconnect the freshwater-estuarine interface on a historic sea-run brook trout stream. At some point in the past, the stream channel was diverted from its natural channel to its present location. The presence of a low-head dam and two marginally passable culverts have blocked connectivity to the marine environment for several decades. A partially degraded stream channel will be relocated back to its original position and rehabilitated to its historic function to allow brook trout to access both freshwater and marine environments. Once complete, the project will provide access to approximately 1 mile of stream habitat and an undetermined amount of marine habitat.
Located in
Projects
/
2006 - 2018 Projects
/
2008 Projects
-
Jam Black Brook Culvert Replacement in Searsmont, Maine
-
This project will remove two improperly placed culverts and replace them with a single, bottomless arch culvert to allow brook trout and Atlantic salmon to access over 10 miles of high quality habitat in Jam Black Brook. It will also improve angling opportunities in Jam Black Brook and the St. Georges River.
Located in
Funded Projects
/
EBTJV Projects
-
Relocation of an Unnamed Sea-Run Brook Trout Stream, Maine
-
This project seeks to reconnect the freshwater-estuarine interface on a historic sea-run brook trout stream. At some point in the past, the stream channel was diverted from its natural channel to its present location. The presence of a low-head dam and two marginally passable culverts have blocked connectivity to the marine environment for several decades. A partially degraded stream channel will be relocated back to its original position and rehabilitated to its historic function to allow brook trout to access both freshwater and marine environments. Once complete, the project will provide access to approximately 1 mile of stream habitat and an undetermined amount of marine habitat.
Located in
Funded Projects
/
EBTJV Projects