Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

21 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
File application/x-maker October 2015 NFH Board Meeting Book
This document contains materials associated with the National Fish Habitat Board's October 20 - 21, 2015 in-person meeting.
Located in About EBTJV / National Fish Habitat Board Meetings / 2015 NFH Board Meetings
File application/x-maker June 2015 NFH Board Meeting Book
This document contains materials associated with the National Fish Habitat Board's June 24, 2015 meeting that was conducted by teleconference.
Located in About EBTJV / National Fish Habitat Board Meetings / 2015 NFH Board Meetings
File application/x-maker March 2015 NFH Board Meeting Book
This document contains materials associated with the National Fish Habitat Board's March 3 - 4, 2016 in-person meeting.
Located in About EBTJV / National Fish Habitat Board Meetings / 2015 NFH Board Meetings
File application/x-maker January 2015 NFH Board Meeting Book
This document contains materials associated with the National Fish Habitat Board's January 15, 2015 meeting that was conducted by teleconference.
Located in About EBTJV / National Fish Habitat Board Meetings / 2015 NFH Board Meetings
File Troff document 2015 MSCGP Grant Performance Report
This document describes the grant-related accomplishments the EBTJV achieved during the 1/1/15 to 12/31/15 performance period.
Located in Projects / EBTJV Operational Grants / 2015 MSCGP Grant
File PS document 2015 MSCGP Grant Scope of Work for Eastern Fish Habitat Partnerships
This document describes the scope of work to be performed by the three Eastern FHPs (ACFHP, SARP, EBTJV) under the 2015 MSCGP grant.
Located in Projects / EBTJV Operational Grants / 2015 MSCGP Grant
File 2015 MSCGP Grant Application
This document describes the full proposal seeking funding from the 2015 MSCGP.
Located in Projects / EBTJV Operational Grants / 2015 MSCGP Grant
File Brook Trout Outcome Management Strategy 2015–2025, v.1
This document describes the management strategies that will implemented to achieve the Brook Trout Outcome contained within the 2014 Chesapeake Bay Watershed Agreement.
Located in Science and Data / Chesapeake Bay Program
File D source code Mill Creek “Chop and Drop”, WV_FY14 Project
Mostly dead and/or down hemlock trees were utilized to create large woody material inspired habitat structures to increase pool habit, increase thalweg meander length, decrease bankfull width, and introduce overhead fish cover. Cross-vanes, j-hooks, wing-deflectors, toe wood, digger logs, and engineered log jams were constructed. The strategic part of this chop and drop effort was to place and anchor logs to minimize movement in bankfull or high events.
Located in Projects / Project Completion Reports
File Octet Stream Dam Removals on an Unnamed Tributary to Frankstown Branch, PA_FY13 Project
Kladder Dam was removed in September 2014 and the tributary through the former impoundment was restored to an appropriate gradient to match the watershed. Stream restoration materials included native soil and rock, clay from the dam’s core, sediment from behind the dam, and Large Wood Debris, all originating on the site. In addition, a riparian corridor was planted in the former impoundment, and several rock jack-dams and brick lining in about 100 feet of the stream channel above the former impoundment were removed by hand.
Located in Projects / Project Completion Reports