Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

26 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
File Restoration of Riverine Process and Habitat Suitability In the Upper Narraguagus River and Northern Stream Focus Areas (Maine)
This project decreases embeddedness by mobilizing the river bed, increasing sediment sorting; increases the number and depth of pools; increases retention of allochthonous organic material that the aquatic food web relies on; reduces the dead waters and over-widened channels in legacy reservoirs; and, increases cold-water fish population resiliency to climate change. The project cost is $155,737 and the estimated socioeconomic benefit is $1.6 million.
Located in Projects / 2019 Projects
File Troff document Harvey’s Lake Dam Removal, South Peacham Brook, Barnet, Vermont
Removal of the Harvey's Lake dam improves natural flow regimes, free-flowing river conditions, water quality and temperature, sediment release and transport, and connectivity to 27 miles within the Stevens River watershed. Floodplain restoration and large wood installations provides additional habitat in South Peacham Brook. The project cost is $861,750 and the estimated socioeconomic benefit is $14.7 million.
Located in Projects / 2019 Projects
File D source code Culvert Replacement and Stream Restoration in Wolfden Run, Garrett County, Maryland
This project, completed in 2021, enhanced 3 miles of in-stream habitat and restored upstream fish passage to 2.76 miles of Brook Trout habitat, reducing habitat fragmentation in the Upper Potomac River watershed. The project cost $189,753 and the estimated socioeconomic benefit is $1.5 million.
Located in Projects / 2019 Projects
File D source code Mill Creek “Chop and Drop”, WV_FY14 Project
Mostly dead and/or down hemlock trees were utilized to create large woody material inspired habitat structures to increase pool habit, increase thalweg meander length, decrease bankfull width, and introduce overhead fish cover. Cross-vanes, j-hooks, wing-deflectors, toe wood, digger logs, and engineered log jams were constructed. The strategic part of this chop and drop effort was to place and anchor logs to minimize movement in bankfull or high events.
Located in Projects / Project Completion Reports
Project chemical/x-pdb Green River Enhancement within the Green River WMA, KY
The Green River and Green River Lake and provide aquatic habitat in the Green River Wildlife Management Area. The river is in declining condition due to severe erosion over almost four decades. Its restoration can allow it to support thriving populations of white bass, smallmouth bass, rock bass, flathead catfish, walleye, and muskellunge, and provide sport challenges to anglers.
Located in Funded Projects / SARP Projects W2B
Project Island Restoration and Habitat Enhancement in Lake Oconee
This project consists of Island restoration and habitat enhancement in Lake Oconee, Georgia.
Located in Funded Projects / SARP Projects W2B
File C header 2012 Interim Report (up to Sept. 30th)
Report of Activities in FY 2012
Located in Funded Projects / EBTJV Projects / Jam Black Brook Culvert Replacement in Searsmont, Maine
File C header 2012 Interim Report (up to Sept. 30th)
Report of Activities in FY 2012
Located in Projects / / 2012 Projects / Jam Black Brook Culvert Replacement in Searsmont, Maine
File chemical/x-pdb New Jersey Enhancement
Subwatersheds best for enhancement in New Jersey
Located in Science and Data / Priority Watershed Maps
File chemical/x-pdb Maine Enhancement
Subwatersheds best for enhancement in Maine
Located in Science and Data / Priority Watershed Maps