-
Hathaway Brook Dam Removal and Stream Restoration in MA
-
The primary goal of this project is to restore natural stream conditions and stream connectivity within Hathaway Brook, thereby enhancing habitat value for existing aquatic species. One barrier will be removed, restoring access to 3,000 feet of stream. The project will reestablish continuous flow and natural sediment transport regimes, and restore geomorphic processes within the channel.
Located in
Funded Projects
/
EBTJV Projects
-
Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts
-
This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.
Located in
Funded Projects
/
EBTJV Projects
-
Thunder Brook Dam Removal, Chesire, Massachusetts
-
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in
Funded Projects
/
EBTJV Projects