Brook Trout Restoration in the Chattahoochee National Forest, Georgia
This project will restore fragmented poor quality habitat and brook trout populations on the Chattahoochee National Forest in Georgia by removing and replacing a culvert on Bryant Creek that is perched and acts as a barrier to fish movement. Additionally, nine miles of habitat will be improved by placing 54 structures in nine streams: Bryant Creek, Chester Creek, Lovinggood Creek, Long Creek, Underwood Creek, Walnut Fork, An unnamed tributary to Ammons Branch, Smith Branch, and Chastain Branch. Electrofishing will be used to renovate three streams: Stover Creek, Walnut Fork, and Tate Branch.
Located in Funded Projects / EBTJV Projects
Carloe Brook Fish Passage Restoration Project, Washington County, Maine
This project will replace an undersized and failing stream crossing on Carloe Brook, a major tributary to Clifford Lake, a wild brook trout water. This stream crossing currently limits passage for trout and other aquatic organisms. The crossing will be replaced with a bottomless arch culvert designed to allow flows at all levels. This will open approximately 3 miles of passage for brook trout and other aquatic organisms.
Located in Funded Projects / EBTJV Projects
Culvert Replacement and Instream Habitat Restoration on Indian Stream, New Hampshire
In 2006, an initial watershed based assessment of coldwater habitat conditions was completed by Trout Unlimited in the Upper Connecticut in New Hampshire and Vermont. In 2008, Trout Unlimited designated the Upper Connecticut as one if its Home Rivers Initiatives, the only one in New England. Trout Unlimited's assessment identified fish habitat problems through the watershed, including lack of riparian habitat, poor instream habitat diversity and complexity, and inadequate stream crossings. This project will initiate the first phase of a long term culvert removal and instream habitat program by replacing four high priority culverts and implementing instream woody habitat restorations in Indian Stream, starting on the East Branch. The culverts to be replaced are on four important brook trout nursery streams: Dry Creek, Johns Brook, Hidden Brook, and Alder Brook. The project will restore 3 miles of habitat on east branch, the largest tributary to Indian Stream.
Located in Funded Projects / EBTJV Projects
Culvert Replacement and Instream Habitat Restoration in the Nulhegan River Vermont
This project will replace three fish passage barriers and install approximately 3 miles of chop and drop instream restorations on the East Branch of the Nulhegan River and its tributaries.
Located in Funded Projects / EBTJV Projects
Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in Funded Projects / EBTJV Projects
Hamant Brook Culvert Replacement, Old Sturbridge Village, Massachusetts
The two leading causes of brook trout habitat degradation in Massachusetts have been identified through the EBTJV as fragmentation by dams and roads. The subwatershed containing Hamant Brook was identified as high impact from dam fragmentation and medium impact from road fragmentation. This project will remove three dams and one impassable culvert, allowing access from mainstem habitat to a coldwater tributary and converting 70% of the project area from impounded to free-flowing. Once complete, the project will open nearly 8 miles of habitat and provide access to more diverse free flowing and coldwater habitats for brook trout and riverine fish species.
Located in Funded Projects / EBTJV Projects
Marshall Brook Culvert Replacement, Hancock County, Maine
This project will replace two existing undersized, improperly set round culvert inhibiting fish passage at the road / stream crossing of Marshall Brook with the Seal Cove Road in Southwest Harbor, Maine with an open bottom culvert. This will provide 4 miles of passage and reconnect a historic sea run brook trout stream with the estuary at Bass Harbor.
Located in Funded Projects / EBTJV Projects
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in Funded Projects / EBTJV Projects
Upper Shavers Fork Aquatic Passage Project, West Virginia
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in Funded Projects / EBTJV Projects