Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
-
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Thunder Brook Dam Removal, Chesire, Massachusetts
-
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Carloe Brook Fish Passage Restoration Project, Washington County, Maine
-
This project will replace an undersized and failing stream crossing on Carloe Brook, a major tributary to Clifford Lake, a wild brook trout water. This stream crossing currently limits passage for trout and other aquatic organisms. The crossing will be replaced with a bottomless arch culvert designed to allow flows at all levels. This will open approximately 3 miles of passage for brook trout and other aquatic organisms.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Restoring Habitat Connectivity in Machias and Saint Croix River Tributary Streams, Maine
-
This project will restore habitat connectivity on three brook trout habitat streams and eliminate ongoing risks of sedimentation during culvert failure, in watersheds identified as brook trout habitat priorities. Removal of four fish passage barriers will reopen 3 miles of passage for brook trout.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Marshall Brook Culvert Replacement, Hancock County, Maine
-
This project will replace two existing undersized, improperly set round culvert inhibiting fish passage at the road / stream crossing of Marshall Brook with the Seal Cove Road in Southwest Harbor, Maine with an open bottom culvert. This will provide 4 miles of passage and reconnect a historic sea run brook trout stream with the estuary at Bass Harbor.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
-
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Culvert Replacement and Instream Habitat Restoration in the Nulhegan River Vermont
-
This project will replace three fish passage barriers and install approximately 3 miles of chop and drop instream restorations on the East Branch of the Nulhegan River and its tributaries.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Nash Stream Restoration Project, Coos County, New Hampshire
-
This project will restore approximately 5.5 miles of instream habitat on the mainstem of Nash Stream between its confluence with Emerson and Long Mountain Brooks. Restoration activities will include boulder placement, pool construction, large wood additions, floodplain reconnection, and riparian vegetation.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Jam Black Brook Culvert Replacement in Searsmont, Maine
-
This project will remove two improperly placed culverts and replace them with a single, bottomless arch culvert to allow brook trout and Atlantic salmon to access over 10 miles of high quality habitat in Jam Black Brook. It will also improve angling opportunities in Jam Black Brook and the St. Georges River.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Restoration of Native Charr in Big Wadleigh Pond Maine
-
This project will restore 157 acres of habitat for native brook trout and arctic charr in Big Wadleigh Pond in northwest Maine by collecting eggs/brook stock from the dwindling adult populations and rearing them in a private hatchery while the pond is chemically treated to eliminate an illegal introduction of rainbow smelt. Restoration will also benefit anglers at this unique and popular fishing destination.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects