-
October 2015 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's October 20 - 21, 2015 in-person meeting.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2015 NFH Board Meetings
-
June 2015 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's June 24, 2015 meeting that was conducted by teleconference.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2015 NFH Board Meetings
-
March 2015 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's March 3 - 4, 2016 in-person meeting.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2015 NFH Board Meetings
-
January 2015 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's January 15, 2015 meeting that was conducted by teleconference.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2015 NFH Board Meetings
-
2015 MSCGP Grant Performance Report
-
This document describes the grant-related accomplishments the EBTJV achieved during the 1/1/15 to 12/31/15 performance period.
Located in
Projects
/
EBTJV Operational Grants
/
2015 MSCGP Grant
-
2015 MSCGP Grant Scope of Work for Eastern Fish Habitat Partnerships
-
This document describes the scope of work to be performed by the three Eastern FHPs (ACFHP, SARP, EBTJV) under the 2015 MSCGP grant.
Located in
Projects
/
EBTJV Operational Grants
/
2015 MSCGP Grant
-
2015 MSCGP Grant Application
-
This document describes the full proposal seeking funding from the 2015 MSCGP.
Located in
Projects
/
EBTJV Operational Grants
/
2015 MSCGP Grant
-
Brook Trout Outcome Management Strategy 2015–2025, v.1
-
This document describes the management strategies that will implemented to achieve the Brook Trout Outcome contained within the 2014 Chesapeake Bay Watershed Agreement.
Located in
Science and Data
/
Chesapeake Bay Program
-
Mill Creek “Chop and Drop”, WV_FY14 Project
-
Mostly dead and/or down hemlock trees were utilized to create large woody material inspired habitat structures to increase pool habit, increase thalweg meander length, decrease bankfull width, and introduce overhead fish cover. Cross-vanes, j-hooks, wing-deflectors, toe wood, digger logs, and engineered log jams were constructed. The strategic part of this chop and drop effort was to place and anchor logs to minimize movement in bankfull or high events.
Located in
Projects
/
Project Completion Reports
-
Dam Removals on an Unnamed Tributary to Frankstown Branch, PA_FY13 Project
-
Kladder Dam was removed in September 2014 and the tributary through the former impoundment was restored to an appropriate gradient to match the watershed. Stream restoration materials included native soil and rock, clay from the dam’s core, sediment from behind the dam, and Large Wood Debris, all originating on the site. In addition, a riparian corridor was planted in the former impoundment, and several rock jack-dams and brick lining in about 100 feet of the stream channel above the former impoundment were removed by hand.
Located in
Projects
/
Project Completion Reports