Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

38 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
File Troff document Lynn Camp Prong Brook Trout Restoration, TN_FY11 Project
This project was focused on removing rainbow trout from Lynn Camp Prong and re-stocking this stream with wild southern Appalachian strain Brook Trout,
Located in Projects / Project Completion Reports
File Troff document Enhancing Connectivity in the West Branch Narraguagus River, ME_FY11 Project
This project replaced degraded road-stream crossings (culverts) with bankfull channel width spanning open bottom structures.
Located in Projects / Project Completion Reports
File Troff document Big Wadleigh Pond Restoration, ME_FY12 Project
This project extirpated invasive rainbow smelt using a chemical reclamation process and native Brook Trout and Artic Charr were re-introduced into the pond.
Located in Projects / Project Completion Reports
File chemical/x-pdb Jam Black Brook Culvert Replacement, ME_FY12 Project
The goals of the project were: (1) To remove an obstruction to upstream fish passage for brook trout, Atlantic salmon and other resident and migratory fish. (2) To restore access to 9.8 miles of stream habitat upstream of the obstruction. (3) To restore natural sediment and woody debris transport through the crossing site. (4) To improve flood capacity at the Magog Road crossing, reducing the risk of debris jams or overtopping the road. (5) To provide a demonstration site in mid‐coast Maine for an appropriate stream crossing developed in cooperation with the municipality.
Located in Projects / Project Completion Reports
File Troff document Scott Brook Fish Passage Restoration, ME_FY13 Project
This project restored ecological stream function within Scott Brook from Big Lake to the Stud Mill Road. It also provided unhindered upstream access to approximately 3 miles of habitat for Brook Trout and other native species. A prolonged sedimentation problem (water overtopping road) that was a direct result of beaver’s plugging the old undersized culvert was minimized by installing a bankfull spanning structure.
Located in Projects / Project Completion Reports
File Troff document Aquatic Habitat Connectivity in the Upper White River Watershed, VT_FY13 Project
This project addressed fish passage barriers at four road-stream crossings.
Located in Projects / Project Completion Reports
File Troff document Little Cards Brook Culvert Replacement, ME_FY16 Project
The project removed an aquatic passage barrier and restored access to an additional ¼ mile of cold water refugia.
Located in Projects / Project Completion Reports
File Troff document Dam Removal on the East Branch of the Passumpsic River, VT_FY17 Project
This project removed the East Burke dam located on the East Branch of the Passumpsic River in order to open 99 miles of stream for aquatic organism passage.
Located in Projects / Project Completion Reports
File Troff document Culvert Replacement in the West Musquash Tributary. ME_FY18 Project
This project replaced a culvert with an open-bottomed arch and installed a 15’ wide earth berm to separate the St. Croix and Machias watersheds to prevent invasive species from range expansion.
Located in Projects / Project Completion Reports
File Assessment of EBTJV Priorities Addressed by Fish Habitat Conservation Projects, 2006-2012
This document contains an overview of the EBTJV priorities targeted by fish habitat conservation projects that received funding from the FWS NFHAP budget appropriations between 2006 and 2012.
Located in Projects / EBTJV Operational Evaluation Reports