Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

165 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Project Octet Stream Thorn Creek Aquatic Passage Project, Pendelton County, West Virginia
This project will remove the 9 identified fish passage barriers in a 50 square mile wild brook trout watershed in Thorn Creek of the South Branch of the Potomac. These impediments block passage in one or both directions, and serve to sustain an outward migration of brook trout into waters which, currently, are lethally warm for brook trout in typical summer conditions. Removal of the blockages will open over 25 miles of perennial stream to brook trout, improving the long term security of the population. Thorn Creek serves as a brook trout nursery for the upper South Branch of the Potomac.
Located in Projects / 2006 - 2018 Projects / 2010 Projects
Thorn Creek Aquatic Passage Project, Pendelton County, West Virginia
This project will remove the 9 identified fish passage barriers in a 50 square mile wild brook trout watershed in Thorn Creek of the South Branch of the Potomac. These impediments block passage in one or both directions, and serve to sustain an outward migration of brook trout into waters which, currently, are lethally warm for brook trout in typical summer conditions. Removal of the blockages will open over 25 miles of perennial stream to brook trout, improving the long term security of the population. Thorn Creek serves as a brook trout nursery for the upper South Branch of the Potomac.
Located in Funded Projects / EBTJV Projects
Thunder Brook Dam Removal, Chesire, Massachusetts
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Thunder Brook Dam Removal, Chesire, Massachusetts
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in Funded Projects / EBTJV Projects
File chemical/x-pdb Tipton Creek Culvert Replacement, NC_FY10 Project
In the summer of 2011 the culvert at the Davis Creek Road (FSR 420) crossing of Tipton Creek was removed and replaced with a concrete arch, stream simulation crossing for the purpose of passing aquatic organisms, where the existing culvert was known to be a barrier to aquatic passage due to velocity and outlet drop. The crossing was sized using the 100-year flow calculation derived from the USGS Regression Equation for the mountains of North Carolina. Additionally, the width of the crossing was designed to accommodate a bankfull flow channel dimension plus a small area of floodplain. The channel was reconstructed through the crossing using the dimension, pattern, and profile of the reference reach upstream. The new channel was constructed using imported boulders and onsite alluvial materials. Grass seed was sown, and trees and shrubs were planted, both potted and live-stakes. Over the last year since construction, the site has experienced several small flood events. The site remains stable, passable to all aquatic species, and looks more and more natural every year as planted and natural vegetation establishes.
Located in Projects / Project Completion Reports
Umpire Brook Culvert Replacement, Vermont
Umpire Brook is a small second order stream in the town of Victory, Vermont. It sustains a wild brook trout population and its watershed is almost entirely forested, with nearly the entire watershed falling within the Victory State Forest. Other than the limited runoff from forest roads, the only significant human-induced impact on this brook is a culvert on Umpire Brook Road. The goal of this project is to replace the current culvert with a bridge that will allow for upstream passage of fish and require less maintenance.
Located in Projects / 2006 - 2018 Projects / 2009 Projects
Umpire Brook Culvert Replacement, Vermont
Umpire Brook is a small second order stream in the town of Victory, Vermont. It sustains a wild brook trout population and its watershed is almost entirely forested, with nearly the entire watershed falling within the Victory State Forest. Other than the limited runoff from forest roads, the only significant human-induced impact on this brook is a culvert on Umpire Brook Road. The goal of this project is to replace the current culvert with a bridge that will allow for upstream passage of fish and require less maintenance.
Located in Funded Projects / EBTJV Projects
Upper Shavers Fork Aquatic Passage Project, West Virginia
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Project Octet Stream Upper Shavers Fork Aquatic Passage Project, West Virginia
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Upper Shavers Fork Aquatic Passage Project, West Virginia
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in Funded Projects / EBTJV Projects