File chemical/x-pdb Tipton Creek Culvert Replacement, NC_FY10 Project
In the summer of 2011 the culvert at the Davis Creek Road (FSR 420) crossing of Tipton Creek was removed and replaced with a concrete arch, stream simulation crossing for the purpose of passing aquatic organisms, where the existing culvert was known to be a barrier to aquatic passage due to velocity and outlet drop. The crossing was sized using the 100-year flow calculation derived from the USGS Regression Equation for the mountains of North Carolina. Additionally, the width of the crossing was designed to accommodate a bankfull flow channel dimension plus a small area of floodplain. The channel was reconstructed through the crossing using the dimension, pattern, and profile of the reference reach upstream. The new channel was constructed using imported boulders and onsite alluvial materials. Grass seed was sown, and trees and shrubs were planted, both potted and live-stakes. Over the last year since construction, the site has experienced several small flood events. The site remains stable, passable to all aquatic species, and looks more and more natural every year as planted and natural vegetation establishes.
Located in Projects / Project Completion Reports
Upper White River Habitat Restoration, VT
This project will address flood and flood recovery related habitat modifications on four tributaries to the Upper White River in Rochester, Vermont by utilizing active instream management and design; establishing riparian buffers; and removing barriers to fish passage in order to restore brook trout habitat and the natural hydrologic regime. When complete, the project will result in the protection and enhancement of 2.75 miles of in-stream habtiat and over 30 acres of floodplain and riparian habitat on the West Branch as well as 8.1 miles of in-stream habtiat in Howe, Marsh, and Nason Brooks.
Located in Funded Projects / EBTJV Projects
File Troff document Application Upper White River Habitat Restoration, Vermont
Application Upper White River Habitat Restoration, Vermont
Located in Funded Projects / EBTJV Projects / Upper White River Habitat Restoration, VT
Restoring Connectivity in the Sunday River and Martin Stream Watersheds, Maine
Subwatersheds of the Androscoggin River contain some of the finest intact and healthy brook trout habitat in the state of Maine. This project will remove two fish passage barriers providing a total of six miles of connectivity in the Sunday River and Martin Stream subwatersheds.
Located in Funded Projects / EBTJV Projects
Restoration of Natural Hydrology and Habitat Complexity in the Machias, Rivers, Maine
This project will remove 11 remnant log drive dams and add large woody debris to restore fish passage, stream connectivity and natural stream processes that will passively restore cold water habitat in the tributaries of the Machias River. A total of 27.2 miles of stream upstream of the dam sites will be affected by the project.
Located in Funded Projects / EBTJV Projects
Dirt & Gravel Road, Streambank Stabilization Project on Cross Fork, Pennsylvania
The Cross Fork subwatershed, part of the Kettle Creek drainage, is considered one of the best of the best brook trout habitat areas in Pennsylvania. The subwatershed, almost entirely contained within the Susquehannock State Forest and thus protected in perpetuity, is widely renowned as a brook trout destination fishery. The watershed is home to a network of dirt and gravel roads where improper road profiles, inadequate draining, and multiple stream crossings have accelerated erosion and transport of sediment to the streams. This project will select and implement high priority projects that focus on dirt and gravel road improvements, streambank stabilization, riparian buffer restoration, and brook trout habitat expansion.
Located in Funded Projects / EBTJV Projects
Dam Removals to Reconnect Brook Trout Habitat on an Unnamed Tributary to Frankstown Branch, PA
This project will remove two fish passage barriers to provide 1.33 miles of unrestricted fish passage to high-quality coldwater spawning and rearing habitat.
Located in Funded Projects / EBTJV Projects
St. Mary's Liming, St. Mary's River, Virginia
The streams of the Saint Mary's Wilderness, located on the slopes of Virginia's Blue Ridge Mountains, have been severely compromised by anthropogenic atmospheric acid deposition. This project will add limestone sand using to the headwater streams of St. Mary's River to enhance over 12 miles of stream for brook trout.
Located in Funded Projects / EBTJV Projects
In-Stream Habitat Restoration in the Meduxnekeag Watershed, Maine
This project will restore 1.9 miles of habitat on the Meduxnekeag River mainstem and 0.25 miles of habitat on its north branch for brook trout within trust land for the Houlton Band of Maliseet Indians. The project will return the river to a more natural, sustainable state of in-stream habitat complexity, increase brook trout habitat quality, and promote interest in future restoration activities.
Located in Funded Projects / EBTJV Projects
Removal of Two Dams in the Wetmore Run Watershed, Potter County, PA
This project will remove the only two dams in the Wetmore Run Watershed in Potter County, Pennsylvania opening 8.5 miles of habitat for brook trout. Removal of the dams will also eliminate thermal pollution and restore lotic ecosystem function.
Located in Funded Projects / EBTJV Projects