-
Restoring Habitat Connectivity in Machias and Saint Croix River Tributary Streams, Maine
-
This project will restore habitat connectivity on three brook trout habitat streams and eliminate ongoing risks of sedimentation during culvert failure, in watersheds identified as brook trout habitat priorities. Removal of four fish passage barriers will reopen 3 miles of passage for brook trout.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Restoring Habitat Connectivity in Machias and Saint Croix River Tributary Streams, Maine
-
This project will restore habitat connectivity on three brook trout habitat streams and eliminate ongoing risks of sedimentation during culvert failure, in watersheds identified as brook trout habitat priorities. Removal of four fish passage barriers will reopen 3 miles of passage for brook trout.
Located in
Funded Projects
/
EBTJV Projects
-
Thunder Brook Dam Removal, Chesire, Massachusetts
-
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Thunder Brook Dam Removal, Chesire, Massachusetts
-
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in
Funded Projects
/
EBTJV Projects
-
Upper Shavers Fork Aquatic Passage Project, West Virginia
-
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Upper Shavers Fork Aquatic Passage Project, West Virginia
-
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in
Funded Projects
/
EBTJV Projects