Enhancing Connectivity in the Ash-Black Rock Subbasin of the WB Narraguagus River, Maine
-
This project will replace two poorly functioning culverts with open bottom arch culverts to allow unhindered fish passage and restore overall ecological stream connectivity. Once complete, the project will open 4.3 miles of habitat from Ash Bog Stream to Black Rock Brook which flows to the West Branch of the Narraguagus River.
Located in
Funded Projects
/
EBTJV Projects
-
Expanding Brook Trout in Willow Creek, Pennsylvania
-
This project will expand suitable habitat in Willow Creek located within Blandon, Berks County, Pennsylvania. Willow Creek is a coldwater fishery that supports one of the most productive wild brook trout populations in the state. This project will restore fish habitat and stream bank stabilization by implementing in-stream habitat enhancement devices in over 5000 feet of the creek. Additionally, over 6 acres of floodplain will be re-vegetated with native trees and shrubs. Local stocking efforts will be shifted to other nearby streams. The project also include an outreach component. Kiosks will be constructed to commemorate the effort and educate future generations. Pamphlets will be distributed to interested citizens.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Expanding Brook Trout in Willow Creek, Pennsylvania
-
This project will expand suitable habitat in Willow Creek located within Blandon, Berks County, Pennsylvania. Willow Creek is a coldwater fishery that supports one of the most productive wild brook trout populations in the state. This project will restore fish habitat and stream bank stabilization by implementing in-stream habitat enhancement devices in over 5000 feet of the creek. Additionally, over 6 acres of floodplain will be re-vegetated with native trees and shrubs. Local stocking efforts will be shifted to other nearby streams. The project also include an outreach component. Kiosks will be constructed to commemorate the effort and educate future generations. Pamphlets will be distributed to interested citizens.
Located in
Funded Projects
/
EBTJV Projects
-
Hamant Brook Culvert Replacement, Old Sturbridge Village, Massachusetts
-
The two leading causes of brook trout habitat degradation in Massachusetts have been identified through the EBTJV as fragmentation by dams and roads. The subwatershed containing Hamant Brook was identified as high impact from dam fragmentation and medium impact from road fragmentation. This project will remove three dams and one impassable culvert, allowing access from mainstem habitat to a coldwater tributary and converting 70% of the project area from impounded to free-flowing. Once complete, the project will open nearly 8 miles of habitat and provide access to more diverse free flowing and coldwater habitats for brook trout and riverine fish species.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Hamant Brook Culvert Replacement, Old Sturbridge Village, Massachusetts
-
The two leading causes of brook trout habitat degradation in Massachusetts have been identified through the EBTJV as fragmentation by dams and roads. The subwatershed containing Hamant Brook was identified as high impact from dam fragmentation and medium impact from road fragmentation. This project will remove three dams and one impassable culvert, allowing access from mainstem habitat to a coldwater tributary and converting 70% of the project area from impounded to free-flowing. Once complete, the project will open nearly 8 miles of habitat and provide access to more diverse free flowing and coldwater habitats for brook trout and riverine fish species.
Located in
Funded Projects
/
EBTJV Projects
-
Hathaway Brook Dam Removal and Stream Restoration in MA
-
The primary goal of this project is to restore natural stream conditions and stream connectivity within Hathaway Brook, thereby enhancing habitat value for existing aquatic species. One barrier will be removed, restoring access to 3,000 feet of stream. The project will reestablish continuous flow and natural sediment transport regimes, and restore geomorphic processes within the channel.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Hathaway Brook Dam Removal and Stream Restoration in MA
-
The primary goal of this project is to restore natural stream conditions and stream connectivity within Hathaway Brook, thereby enhancing habitat value for existing aquatic species. One barrier will be removed, restoring access to 3,000 feet of stream. The project will reestablish continuous flow and natural sediment transport regimes, and restore geomorphic processes within the channel.
Located in
Funded Projects
/
EBTJV Projects
-
In-Stream Habitat Restoration in the Meduxnekeag Watershed, Maine
-
This project will restore 1.9 miles of habitat on the Meduxnekeag River mainstem and 0.25 miles of habitat on its north branch for brook trout within trust land for the Houlton Band of Maliseet Indians. The project will return the river to a more natural, sustainable state of in-stream habitat complexity, increase brook trout habitat quality, and promote interest in future restoration activities.
Located in
Projects
/
2006 - 2018 Projects
/
2013 Projects
-
In-Stream Habitat Restoration in the Meduxnekeag Watershed, Maine
-
This project will restore 1.9 miles of habitat on the Meduxnekeag River mainstem and 0.25 miles of habitat on its north branch for brook trout within trust land for the Houlton Band of Maliseet Indians. The project will return the river to a more natural, sustainable state of in-stream habitat complexity, increase brook trout habitat quality, and promote interest in future restoration activities.
Located in
Funded Projects
/
EBTJV Projects
-
Jam Black Brook Culvert Replacement in Searsmont, Maine
-
This project will remove two improperly placed culverts and replace them with a single, bottomless arch culvert to allow brook trout and Atlantic salmon to access over 10 miles of high quality habitat in Jam Black Brook. It will also improve angling opportunities in Jam Black Brook and the St. Georges River.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects