Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

44 items matching your search terms.
Filter the results.
Item type
















New items since



Sort by relevance · date (newest first) · alphabetically
Jam Black Brook Culvert Replacement in Searsmont, Maine
This project will remove two improperly placed culverts and replace them with a single, bottomless arch culvert to allow brook trout and Atlantic salmon to access over 10 miles of high quality habitat in Jam Black Brook. It will also improve angling opportunities in Jam Black Brook and the St. Georges River.
Located in Projects / 2012 Projects
Nash Stream Restoration Project, Coos County, New Hampshire
This project will restore approximately 5.5 miles of instream habitat on the mainstem of Nash Stream between its confluence with Emerson and Long Mountain Brooks. Restoration activities will include boulder placement, pool construction, large wood additions, floodplain reconnection, and riparian vegetation.
Located in Projects / 2012 Projects
Culvert Replacement and Instream Habitat Restoration in the Nulhegan River Vermont
This project will replace three fish passage barriers and install approximately 3 miles of chop and drop instream restorations on the East Branch of the Nulhegan River and its tributaries.
Located in Projects / 2012 Projects
Oats Run, Upper Shavers Fork, Aquatic Passage Project in Pocahontas County, WV
This project will restore habitat linkages between a brook trout spawning tributary in Oats Run and the mainstem of the Upper Shaver's Fork at Spruce West Virginia. One passage barrier will be removed and replaced with passage friendly culverts and natural stream design techniques will be utilized above and below the new structure to ensure fish passage. The project will provide 4 miles of passage for brook trout.
Located in Projects / 2012 Projects
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in Projects / 2012 Projects
Project Troff document Pelican Point Shoreline Protection and Habitat Restoration Project
Led by The Nature Conservancy, the Pelican Point project created of two 56' oyster reefs at Pelican Point, north of the mouth of Weeks Bay on Mobile Bay to protect the shoreline and restore aquatic habitat.
Located in Funded Projects / SARP Projects W2B
Project Troff document GTMNERR Community Oyster Shell Recycling and Living Reef Construction Project
This project established an oyster shell recycling program for St. Johns County, Florida, constructed a living shoreline, and planted spartina grass within the boundaries of the new reef to further protect the shoreline and provide nursery habitat for marine species at the Guana Tolomato Matanzas National Estuarine Research Reserve.
Located in Funded Projects / SARP Projects W2B
Project Octet Stream Living Shoreline - Little St. Simons Island, GA.
This project removed a failing bulkhead on Little St. Simons Island, GA and installed a living shoreline in its place to provide stream bank stabilization, habitat for eastern oysters, and essential fish habitat.
Located in Funded Projects / SARP Projects W2B
Project Restoration of Connectivity to Coal Pile, a Backwater of the Arkansas River
In order to restore connectivity to Coal Pile, the canals from the Arkansas River into Coal Pile will be dredged with a Mudcat hydraulic dredge, which was recently obtained from federal surplus equipment for use on this project.
Located in Funded Projects / SARP Projects W2B
Project Upper Savannah Biological Assessment of Redeye Bass
Located in Funded Projects / SARP Projects W2B