Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

14 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Project Nashville crayfish Habitat Restoration on the Nashville Zoo Property
Mill Creek Watershed has been negatively affected by urbanization,resulting in increased sedimentation,reduced habitat quality, ultimately resulting in the Nashville crayfish being federally listed. This project will restore an unnamed tributary of Mill Creek by removing a barrier and restoring connectivity of the tributary.
Located in Funded Projects / SARP Projects W2B
Reflections on Brook Trout Conservation over the past 6 years
Nat Gillespie talks about the state of brook trout conservation. Nat is the Assistant National Fish Program Leader for the US Forest Service in their Washington, DC headquarters. He served as the EBTJV Steering Committee Chair from 2017-2022.
Located in News & Events / News Inbox
File Restoring habitat connectivity in Machias and Saint Croix River tributary streams, ME_FY11 Project
Through this project, Downeast Lakes Land Trust (DLLT) continued its work with partners to restore brook trout habitat on priority streams within its 55,678-acre Downeast Lakes Community Forest by removing passage barriers. Of the four sites included in the original proposal (Billy Brown Brook/Shaw St., Amazon Brook/Amazon Rd., Grand Lake Brook/Fourth Lake Rd., and Fourth Lake Trib./Belden Brook Rd), two were completed using NRCS funding received after the initial proposal was submitted to USFWS. As a result, Eastern Brook Trout Joint Venture funding was used to restore fish passage at two additional sites at South Branch/Little River Rd and Towers Brook/Little River Rd.
Located in Projects / Project Completion Reports
File chemical/x-pdb Tipton Creek Culvert Replacement, NC_FY10 Project
In the summer of 2011 the culvert at the Davis Creek Road (FSR 420) crossing of Tipton Creek was removed and replaced with a concrete arch, stream simulation crossing for the purpose of passing aquatic organisms, where the existing culvert was known to be a barrier to aquatic passage due to velocity and outlet drop. The crossing was sized using the 100-year flow calculation derived from the USGS Regression Equation for the mountains of North Carolina. Additionally, the width of the crossing was designed to accommodate a bankfull flow channel dimension plus a small area of floodplain. The channel was reconstructed through the crossing using the dimension, pattern, and profile of the reference reach upstream. The new channel was constructed using imported boulders and onsite alluvial materials. Grass seed was sown, and trees and shrubs were planted, both potted and live-stakes. Over the last year since construction, the site has experienced several small flood events. The site remains stable, passable to all aquatic species, and looks more and more natural every year as planted and natural vegetation establishes.
Located in Projects / Project Completion Reports