-
Restoring Habitat Connectivity in the Bob's Creek Watershed, Pennsylvania
-
The purpose of this project is to improve brook trout habitat connectivity in the Bobbs Creek watershed on the Allegheny National Forest. To accomplish this, two road crossings will be replaced with single open-bottom culverts. Also, this project will reduce flooding potential on the USFS road 116 and reduce the delivery of sediment to the stream through improved surfacing of the road.
Located in
Projects
/
2006 - 2018 Projects
/
2009 Projects
-
Restoring Habitat Connectivity in the Bob's Creek Watershed, Pennsylvania
-
The purpose of this project is to improve brook trout habitat connectivity in the Bobbs Creek watershed on the Allegheny National Forest. To accomplish this, two road crossings will be replaced with single open-bottom culverts. Also, this project will reduce flooding potential on the USFS road 116 and reduce the delivery of sediment to the stream through improved surfacing of the road.
Located in
Funded Projects
/
EBTJV Projects
-
Riparian Buffers for Private Lands - PA links to funding
-
Forested riparian buffers are an important tool in helping to protect and ensure stream quality by providing critical barriers between polluting landscapes and receiving waterways. Use the resources linked here to learn how you can make a difference in stream health and vitality by implementing riparian buffers on your land.
Located in
The Story of Wild Brook Trout
/
Landowner Resources
-
Smethport Reservoir Dam Removal and Habitat Restoration, Pennsylvania
-
This project seeks to remove the Smethport Reservoir Dam to restore passage and free flowing stream habitat for brook trout on Blacksmith Run and eliminate a significant liability and safety concern and reduce localized flooding. Approximately 1.9 miles of stream will be reopened to fish passage, 770 linear feet of in-stream habitat restored, and 1540 feet of riparian habitat restored. Additional benefits anticipated from the project include improvements in water quality, enhanced transport of nutrients and woody debris, and re-established connectivity between the stream, riparian area and groundwater interface.
Located in
Projects
/
2006 - 2018 Projects
/
2008 Projects
-
South Branch of Kinzua Creek Acid Precipitation Remediation Project, Pennsylvania
-
This project is a design/construct/implementation/research project located in Allegheny National Forest, in Hamlin and Wetmore Townships, McKean County that when completed will restore water quality and reestablish recruitment of brook trout within approximately 5 miles of stream. Three acid precipitation impaired tributaries of the South Branch of Kinzua Creek will be treated and restored in concert with routine Forest Service road maintenance by constructing innovative passive treatment systems that will supply buffering capacity to the watershed via the roads stormwater management facility.
Located in
Projects
/
2006 - 2018 Projects
/
2009 Projects
-
South Branch of Kinzua Creek Acid Precipitation Remediation Project, Pennsylvania
-
This project is a design/construct/implementation/research project located in Allegheny National Forest, in Hamlin and Wetmore Townships, McKean County that when completed will restore water quality and reestablish recruitment of brook trout within approximately 5 miles of stream. Three acid precipitation impaired tributaries of the South Branch of Kinzua Creek will be treated and restored in concert with routine Forest Service road maintenance by constructing innovative passive treatment systems that will supply buffering capacity to the watershed via the roads stormwater management facility.
Located in
Funded Projects
/
EBTJV Projects
-
South Branch of Kinzua Creek Acid Precipitation Remediation Project, Pennsylvania
-
This project is a design/construct/implementation/research project located in Allegheny National Forest, in Hamlin and Wetmore Townships, McKean County that when completed will restore water quality and reestablish recruitment of brook trout within approximately 5 miles of stream. Three acid precipitation impaired tributaries of the South Branch of Kinzua Creek will be treated and restored in concert with routine Forest Service road maintenance by constructing innovative passive treatment systems that will supply buffering capacity to the watershed via the roads stormwater management facility.
Located in
Funded Projects
/
EBTJV Projects
-
South Fork Little Conemaugh River Brook Trout Renewal, Pennsylvania
-
Deep mining activities along the stream have resulted in chronic AMD into the stream. AMD along with acid deposition have depressed the brook trout and aquatic life in this 4 mile stretch due to low pH, high aluminum, and low alkalinity. The objective of this project is to mitigate the sources of the AMD with limestone beds and mitigate the acid deposition with limestone sand dosing. Restoring the pH and alkalinity regime will allow for a renewed brook trout population and overall aquatic life restoration along 4 miles of stream.
Located in
Projects
/
2006 - 2018 Projects
/
2008 Projects
-
South Fork Little Conemaugh River Brook Trout Renewal, Pennsylvania
-
Deep mining activities along the stream have resulted in chronic AMD into the stream. AMD along with acid deposition have depressed the brook trout and aquatic life in this 4 mile stretch due to low pH, high aluminum, and low alkalinity. The objective of this project is to mitigate the sources of the AMD with limestone beds and mitigate the acid deposition with limestone sand dosing. Restoring the pH and alkalinity regime will allow for a renewed brook trout population and overall aquatic life restoration along 4 miles of stream.
Located in
Funded Projects
/
EBTJV Projects
-
South Sandy Creek Restoration, Williams Run, Pennsylvania
-
The partnership will restore Williams Run so that it can support life, with lime treatments in the short term and by constructing a limestone bed system to passively treat acid mine drainage for the long term. Tributaries flowing into Williams Run currently support healthy populations of wild brook trout. This project will allow currently isolated populations of native brook trout to return to the main stem of Williams Run, connecting them and expanding their range. These water quality improvements on private property will benefit stream habitat downstream on State Forest Lands. The landowners have committed to allowing public fishing in this area greatly expanding the brook trout fishing opportunities in western Pennsylvania.
Located in
Projects
/
2006 - 2018 Projects
/
2007 Projects