-
Ayers Brook Corridor Restoration White River, Vermont
-
This project will restore riparian and associated aquatic habitats and floodplain access along a 6.8 mile stretch of Ayers Brook in Vermont. Additionally, the replacement and / or retrofitting of undersized structures on Ayers Brook will be prioritized for future restoration efforts.
Located in
Funded Projects
/
EBTJV Projects
-
Umpire Brook Culvert Replacement, Vermont
-
Umpire Brook is a small second order stream in the town of Victory, Vermont. It sustains a wild brook trout population and its watershed is almost entirely forested, with nearly the entire watershed falling within the Victory State Forest. Other than the limited runoff from forest roads, the only significant human-induced impact on this brook is a culvert on Umpire Brook Road. The goal of this project is to replace the current culvert with a bridge that will allow for upstream passage of fish and require less maintenance.
Located in
Funded Projects
/
EBTJV Projects
-
Culvert Replacement and Instream Habitat Restoration in the Nulhegan River Vermont
-
This project will replace three fish passage barriers and install approximately 3 miles of chop and drop instream restorations on the East Branch of the Nulhegan River and its tributaries.
Located in
Funded Projects
/
EBTJV Projects
-
Application Upper White River Habitat Restoration, Vermont
-
Application Upper White River Habitat Restoration, Vermont
Located in
Funded Projects
/
EBTJV Projects
-
Application Upper White River Habitat Restoration, Vermont
-
Application Upper White River Habitat Restoration, Vermont
Located in
Funded Projects
/
EBTJV Projects
/
Upper White River Habitat Restoration, VT
-
Application Upper White River Habitat Restoration, Vermont
-
Application Upper White River Habitat Restoration, Vermont
Located in
Projects
/
…
/
2013 Projects
/
Upper White River Habitat Restoration, VT
-
Upper White River Habitat Restoration, VT
-
This project will address flood and flood recovery related habitat modifications on four tributaries to the Upper White River in Rochester, Vermont by utilizing active instream management and design; establishing riparian buffers; and removing barriers to fish passage in order to restore brook trout habitat and the natural hydrologic regime. When complete, the project will result in the protection and enhancement of 2.75 miles of in-stream habtiat and over 30 acres of floodplain and riparian habitat on the West Branch as well as 8.1 miles of in-stream habtiat in Howe, Marsh, and Nason Brooks.
Located in
Funded Projects
/
EBTJV Projects
-
Guidelines for the Design of Stream Road Crossings for Passage of Aquatic Organisms in Vermont
-
Stream Crossing Guidelines for Vermont
Located in
Science and Data
/
Aquatic Organism Passage I&A and state design guidelines
/
State Sream Crossing Guidelines