Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home / Practitioners (individuals) / Perry, Stephen

Search results

367 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Darnit Brook Culvert Replacement, Nezinscot-Androscoggin River, Buckfield, ME
This project restores Brook Trout passage to 8 miles of headwater streams (perennial + intermittent) by replacing a failing culvert with an open bottom arch structure that is sized to pass a 100-year flood event. This project costs $210,189 and the estimated socioeconomic benefit is $4.3 million.
Located in Projects / 2006 - 2018 Projects / 2018 Projects
File application/x-troff-me Darnit Brook Culvert Replacement, Nezinscot-Androscoggin River, Buckfield, ME
Project application
Located in Projects / / 2018 Projects / Darnit Brook Culvert Replacement, Nezinscot-Androscoggin River, Buckfield, ME
St. Croix River Tributary Culvert Replacement,West Musquash Tributary, Grand Lake Stream, Maine
This project will improve access to a West Musquash Tributary (Otter Brook) for fish and other aquatic organisms and restore the ecological function of this stream. In addition, the project will address a chronic sedimentation problem that is detrimental to the health of the stream, the 4,200 acre Big Musquash wetlands complex, and the West Branch of the St. Croix River International Waterway. The project cost is $44,000 and the estimated socioeconomic benefit is $0.8 million.
Located in Projects / 2006 - 2018 Projects / 2018 Projects
File St. Croix River Tributary Culvert Replacement,West Musquash Trib., Grand Lake Stream, Maine
Project application
Located in Projects / / 2018 Projects / St. Croix River Tributary Culvert Replacement,West Musquash Tributary, Grand Lake Stream, Maine
Wilson Creek Watershed Improvement Project, Rugby, VA
This project will reduce chronic erosion and sedimentation coming from horse trails, protecting 15 stream miles downstream from the crossings. It will also protect headwater seeps from trampling erosion, and allow 300 acres of riparian vegetation to grow, further shading the stream and filtering field runoff. Riparian restoration will favor native red spruce, which in turn will provide a cool, moist micro-climate consistent with maintaining wild Brook Trout streams. The project cost is $120,000 and the estimated socioeconomic benefit is $8.2 million.
Located in Projects / 2006 - 2018 Projects / 2018 Projects
File Octet Stream Wilson Creek Watershed Improvement Project, Rugby, VA
Project application
Located in Projects / / 2018 Projects / Wilson Creek Watershed Improvement Project, Rugby, VA
2017 Projects
This folder contains information on the three habitat projects funded in FY17. Collectively these projects will remove 3 fish passage barriers to reconnect 92.5 miles of habitat and restore 3.44 miles of in-stream habitat for wild Brook Trout by removing Rainbow Trout, an invasive species. These projects were funded by the EBTJV and U.S. Fish and Wildlife Service for $112,642. An additional $589,470 in partner contributions are expected. The estimated socioeconomic value of these projects is $52.7 million.
Located in Projects / 2006 - 2018 Projects
Dam Removal, East Branch Passumpsic River, East Burke, Vermont
Removal of this deteriorating dam will improve natural flow regimes, free-flowing river conditions, water quality and temperature, sediment release and transport, and connectivity resulting in re-opening 99 migratory miles on the East Branch of the Passumpsic River. In addition, 3.4 acres of shrub-scrub wetland will be enhanced by removal of the dam and subsequent restoration work. Total project cost is $325,000. This was a Waters to Watch project in 2018! http://www.fishhabitat.org/waters-to-watch/detail/east-branch-passumpsic-river-vermont FWS coverage: https://www.fws.gov/media/removing-east-burke-dam-vermont
Located in Projects / 2006 - 2018 Projects / 2017 Projects
File Troff document Dam Removal, East Branch Passumpsic River, East Burke, Vermont
Project application
Located in Projects / / 2017 Projects / Dam Removal, East Branch Passumpsic River, East Burke, Vermont
Enhancing and Connecting Wild Brook Trout Populations in VT’s West Mountain Wildlife Management Area
This project will replace one stream crossing and remove another that currently prevents the movement of fish and other aquatic organisms in the West Mountain Pond watershed. The new structures will open 2.5 stream miles and permit fish and other aquatic organisms to move in search of cold water refugia, food, and spawning habitat. In addition, woody habitat will be restored to 1.25 stream. Total project cost is $143,000.
Located in Projects / 2006 - 2018 Projects / 2017 Projects