The purpose of the project is to restore critical instream habitat within Sparta Glen Brook, including natural pool regimes and spawning areas, restore toe of slope protection, further stabilize upland fringe areas, as well as the riparian corridor along a 0.68 mile stretch. The project will result in an increase in the trout population, reduce sedimentation and protect the stream from future storm events.
Located in
Projects
/
2006 - 2018 Projects
/
2016 Projects