Photo 2 of Morrison Run PA
-
Photo of undersized culvert, Morrison Run, PA
Located in
Projects
/
…
/
Unfunded Applications in 2013
/
Morrison Run Enhancement Project, PA
-
Photo 1 for Morrison Run, PA
-
Photo of Upper Dam, Morrison Run, PA
Located in
Projects
/
…
/
Unfunded Applications in 2013
/
Morrison Run Enhancement Project, PA
-
Former dam on Hamant Brook in Massachusetts
-
Dam removed from Hamant Brook in Massachusetts, as part of a 2010 project. 8 miles of stream were re-opened.
Located in
Projects
/
…
/
2010 Projects
/
Hamant Brook Culvert Replacement, Old Sturbridge Village, Massachusetts
-
Project SHARE
-
Located in
About EBTJV
/
EBTJV Partners
/
Organizations
-
2006 NFWF Grant - Eastern Brook Trout Habitat Restoration
-
This folder contains all of the documents from the grant that EBTJV received from NFWF in 2006 for multiple habitat projects. A total of $90,000 was received from NFWF for projects in New Hampshire, Maine, Vermont, Pennsylvania, West Virginia, and Virginia.
Located in
Projects
/
EBTJV Operational Grants
-
Upper Shavers Fork Instream and Riparian Habitat Restoration, Randolph County, WV
-
This project will restore instream coldwater habitat in approximately one mile of the Shavers Fork mainstem, and restore riparian habitat on both sides of the Shavers Fork mainstem in the restoration reach. A partner project will simultaneously improve fish passage and habitat in Powerhouse Run, another spawning tributary of Shavers Fork. These actions will cool elevated mainstem temperatures both within and downstream of the project area, enhance mainstem habitat, increase access to the mainstem forage base, and facilitate genetic mixing within the metapopulation.
Located in
Projects
/
2006 - 2018 Projects
/
2015 Projects
-
Nash Stream Restoration & Columbia Road Culverts, Odell, Coos County, NH
-
This Project will restore six miles of instream habitat by adding wood and other habitat elements, and will replace two culverts to remediate long-term habitat impairments caused by a catastrophic dam break,
subsequent bulldozing and berming, active and passive removal of instream wood and geomorphically-incompatible stream crossings, ultimately resulting in the restoration of thriving wild brook trout populations in Nash Stream and its perennial tributaries.
Located in
Projects
/
2006 - 2018 Projects
/
2015 Projects
-
Beebe River Watershed Project Application
-
Application for Beebe River Watershed Project
Located in
Projects
/
…
/
2016 Projects
/
Beebe River Watershed Connectivity Project, Campton and Sandwich, NH
-
Beebe River Watershed Connectivity Project, Campton and Sandwich, NH
-
This project includes the removal and replacement of five stream crossings in the Beebe River
Watershed on a 5,435 acre parcel recently acquired by The Conservation Fund. These
crossings are on five separate tributary streams that flow into the Beebe River in Campton and
Sandwich, NH. Wild brook trout have been documented in all of these streams and the
watershed area upstream of this property is completely encompassed within the White
Mountain National Forest. This project restores watershed level function by providing over 5 miles of accessible thermal refuge and spawning locations in 5 high priority locations along about 30% of the entire length of the Beebe River. 2015 summer temperature data indicates survival in the Beebe River is
likely compromised without access to these tributaries.
Located in
Projects
/
2006 - 2018 Projects
/
2016 Projects
-
Little Cards Brook Culvert Replacement, Franklin ME
-
This project will replace an undersized and failing stream crossing on Little Cards Brook, a wild brook trout water. It will also fix a chronic sedimentation problem that is detrimental to the health of the stream and Great Pond. The project will result in improved access over Little Cards Brook and enhancement of native brook trout habitat.
Located in
Projects
/
2006 - 2018 Projects
/
2016 Projects