Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home / Practitioners (individuals) / Perry, Stephen

Search results

365 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Interactive webmap and visualization tools.
Located in Science and Data / Data and Brook Trout Decision Support Tools / TU Eastern Brook Trout Conservation Portfolio, Range-wide Assessment and Focal Area Tools
Reports and tools associated with this TU project.
Located in Science and Data / Data and Brook Trout Decision Support Tools / TU Eastern Brook Trout Conservation Portfolio, Range-wide Assessment and Focal Area Tools
File SIS package Eastern Brook Trout Conservation Portfolio, Range-wide Habitat Integrity and Future Security Assessment, and Focal Area Risk and Opportunity Analysis
Trout Unlimited has developed three conservation planning products to help identify strategic conservation opportunities and evaluate potential projects within the eastern range of brook trout (Salvelinus fontinalis or EBT). Each product gathers and interprets spatial data related to the pattern of EBT populations, their habitats, and threats to those habitats. The basic unit of analysis and summary for all three products is the Eastern Brook Trout Joint Venture’s EBT population patch.
Located in Science and Data / Data and Brook Trout Decision Support Tools / TU Eastern Brook Trout Conservation Portfolio, Range-wide Assessment and Focal Area Tools
TU Eastern Brook Trout Conservation Portfolio, Range-wide Assessment and Focal Area Tools
Trout Unlimited developed three conservation planning products to help identify strategic conservation opportunities and evaluate potential projects within the range of Eastern Brook Trout (EBT) in the eastern US.
Located in Science and Data / Data and Brook Trout Decision Support Tools
File Restoring habitat connectivity in Machias and Saint Croix River tributary streams, ME_FY11 Project
Through this project, Downeast Lakes Land Trust (DLLT) continued its work with partners to restore brook trout habitat on priority streams within its 55,678-acre Downeast Lakes Community Forest by removing passage barriers. Of the four sites included in the original proposal (Billy Brown Brook/Shaw St., Amazon Brook/Amazon Rd., Grand Lake Brook/Fourth Lake Rd., and Fourth Lake Trib./Belden Brook Rd), two were completed using NRCS funding received after the initial proposal was submitted to USFWS. As a result, Eastern Brook Trout Joint Venture funding was used to restore fish passage at two additional sites at South Branch/Little River Rd and Towers Brook/Little River Rd.
Located in Projects / Project Completion Reports
File D source code Mill Creek “Chop and Drop”, WV_FY14 Project
Mostly dead and/or down hemlock trees were utilized to create large woody material inspired habitat structures to increase pool habit, increase thalweg meander length, decrease bankfull width, and introduce overhead fish cover. Cross-vanes, j-hooks, wing-deflectors, toe wood, digger logs, and engineered log jams were constructed. The strategic part of this chop and drop effort was to place and anchor logs to minimize movement in bankfull or high events.
Located in Projects / Project Completion Reports
File Octet Stream Dam Removals on an Unnamed Tributary to Frankstown Branch, PA_FY13 Project
Kladder Dam was removed in September 2014 and the tributary through the former impoundment was restored to an appropriate gradient to match the watershed. Stream restoration materials included native soil and rock, clay from the dam’s core, sediment from behind the dam, and Large Wood Debris, all originating on the site. In addition, a riparian corridor was planted in the former impoundment, and several rock jack-dams and brick lining in about 100 feet of the stream channel above the former impoundment were removed by hand.
Located in Projects / Project Completion Reports
File Octet Stream Removal of Two Dams in the Wetmore Run Watershed, PA_FY12 Project
As part of a plan to upgrade their public water supply to a non-dam alternative, the Borough of Galeton agreed to remove two dams and their associated impoundments. The dams were located on Wetmore Run and Right Branch of Wetmore Run, Potter County, PA. Both streams are classified as High Quality – Coldwater Fishery (HQ – CWF) by the Pennsylvania Department of Environmental Protection (PA DEP) and drain a predominantly forested watershed comprised of ~60% public land. The barriers blocked upstream Brook Trout passage to approximately 8.5 miles of headwater habitat, contributed to the elevation of instream temperatures, interrupted the natural flow regime, and negatively impacted ecosystem function. As a result of the dam removals, almost 8.5 miles of headwater habitat was reconnected to the rest of the upper Pine Creek Watershed, which contains several intact eastern Brook Trout populations.
Located in Projects / Project Completion Reports
File chemical/x-pdb Jam Black Brook Culvert Replacement, ME_FY12 Project
The goals of the project were: (1) To remove an obstruction to upstream fish passage for brook trout, Atlantic salmon and other resident and migratory fish. (2) To restore access to 9.8 miles of stream habitat upstream of the obstruction. (3) To restore natural sediment and woody debris transport through the crossing site. (4) To improve flood capacity at the Magog Road crossing, reducing the risk of debris jams or overtopping the road. (5) To provide a demonstration site in mid‐coast Maine for an appropriate stream crossing developed in cooperation with the municipality.
Located in Projects / Project Completion Reports
File Troff document Lynn Camp Prong Brook Trout Restoration, TN_FY11 Project
This project was focused on removing rainbow trout from Lynn Camp Prong and re-stocking this stream with wild southern Appalachian strain Brook Trout,
Located in Projects / Project Completion Reports