-
Improved Red Drum Habitat through Community-based Oyster Reef Habitat Restoration
-
Little has been attempted to improve the habitat to ensure survival of stocked red drum fingerlings in SC waters This project will create additional oyster reefs in stocking areas. The impact will be many fold as other organisms will utilize the habitat and oyster population and water quality improvements will be recognized. Patches of hard substrate and 3-D reefs will be created in stocking areas, thus establishing quality habitat for red drum at this early life stage.
Located in
Funded Projects
/
SARP Projects W2B
-
Island Restoration and Habitat Enhancement in Lake Oconee
-
This project consists of Island restoration and habitat enhancement in Lake Oconee, Georgia.
Located in
Funded Projects
/
SARP Projects W2B
-
Jockey's Ridge State Park Community-based Living Shoreline Restoration Phase I and II
-
Jockey’s Ridge State Park is the location of the largest sand dune system on the east coast. It is part of the Roanoke River Watershed, which flows from Virginia through North Carolina to the sea. Its estuarine shoreline had never been stabilized prior to making the area into a state park. However, the estuarine shoreline had been damaged by vehicle and foot traffic, and acres of salt marsh had disappeared.
Located in
Funded Projects
/
SARP Projects W2B
-
Lake Mary Weir Repair
-
This project repaired a Weir in Lake Mary within the state of Mississippi increasing water levels to benefit sport fish. (Photo: Lake Mary Weir before Construction)
Located in
Funded Projects
/
SARP Projects W2B
-
Nuisance aquatic vegetation removal/control in Caddo Lake (TX and LA)
-
This project will remove and control nuisance aquatic vegetation in Caddo Lake within the states of Texas and Louisiana.
Located in
Funded Projects
/
SARP Projects W2B
-
October 2008 NFH Board Meeting Book
-
This document contains materials associated with the National Fish Habitat Board's October 7-8, 2008 in-person meeting.
Located in
About EBTJV
/
National Fish Habitat Board Meetings
/
2008 NFH Board Meetings
-
Oyster Reef Restoration Through the Use of Non-shell Cultch Material in the Estarine Areas of the Altamaha River, GA
-
Restoration of oysters along southeastern coasts is important for economic and ecological reasons. Oysters enhance waterquality. Their reefs buffer wave action adjacent to marshes, and they are harvested and marketed by commercial fishermen.
Located in
Funded Projects
/
SARP Projects W2B
-
Relocation of an Unnamed Sea-Run Brook Trout Stream, Maine
-
This project seeks to reconnect the freshwater-estuarine interface on a historic sea-run brook trout stream. At some point in the past, the stream channel was diverted from its natural channel to its present location. The presence of a low-head dam and two marginally passable culverts have blocked connectivity to the marine environment for several decades. A partially degraded stream channel will be relocated back to its original position and rehabilitated to its historic function to allow brook trout to access both freshwater and marine environments. Once complete, the project will provide access to approximately 1 mile of stream habitat and an undetermined amount of marine habitat.
Located in
Projects
/
2006 - 2018 Projects
/
2008 Projects
-
Relocation of an Unnamed Sea-Run Brook Trout Stream, Maine
-
This project seeks to reconnect the freshwater-estuarine interface on a historic sea-run brook trout stream. At some point in the past, the stream channel was diverted from its natural channel to its present location. The presence of a low-head dam and two marginally passable culverts have blocked connectivity to the marine environment for several decades. A partially degraded stream channel will be relocated back to its original position and rehabilitated to its historic function to allow brook trout to access both freshwater and marine environments. Once complete, the project will provide access to approximately 1 mile of stream habitat and an undetermined amount of marine habitat.
Located in
Funded Projects
/
EBTJV Projects
-
Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts
-
This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.
Located in
Projects
/
2006 - 2018 Projects
/
2008 Projects