Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home / Projects / 2006 - 2018 Projects / 2008 Projects / Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts

Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts

This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.

Photo 1 of Briggsville Dam in MA

Photo 1 of Briggsville Dam in MA

Photo 2 of Briggsville Dam in MA

Photo 2 of Briggsville Dam in MA

Photo 3 of Briggsville Dam, MA

Photo 3 of Briggsville Dam, MA

Associated Locations

Town zip code county state congressional dist

Barriers

Name of barrier Latitude Longitude FONS ID FIS Project ID FWS Acc. #

Document Actions