Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

165 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Restoration of Natural Hydrology and Habitat Complexity in the Machias, Rivers, Maine
This project will remove 11 remnant log drive dams and add large woody material to restore fish passage, stream connectivity and natural stream processes that will passively restore cold water habitat in the tributaries of the Machias River. A total of 27.2 miles of stream upstream of the dam sites will be affected by the project.
Located in Projects / 2006 - 2018 Projects / 2013 Projects
Restoration of Natural Hydrology and Habitat Complexity in the Machias, Rivers, Maine
This project will remove 11 remnant log drive dams and add large woody debris to restore fish passage, stream connectivity and natural stream processes that will passively restore cold water habitat in the tributaries of the Machias River. A total of 27.2 miles of stream upstream of the dam sites will be affected by the project.
Located in Funded Projects / EBTJV Projects
Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts
This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.
Located in Projects / 2006 - 2018 Projects / 2008 Projects
Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts
This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.
Located in Funded Projects / EBTJV Projects
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in Projects / 2006 - 2018 Projects / 2012 Projects
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in Funded Projects / EBTJV Projects
Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
Tipton Creek is located within the Upper Tellico Off-Highway Vehicle Area on the Tusquitee Ranger District of the Nantahala National Forest. The entire watershed is in public ownership except for several small private inholdings, one of which is along a middle reach of Tipton Creek. Currently the Forest Service is evaluatingalternatives for future management of the Off-Highway Vehicle Area because of significant resources damage, particularly to streams and resident brook trout populations. This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream.
Located in Projects / 2006 - 2018 Projects / 2010 Projects
Project Octet Stream Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
Tipton Creek is located within the Upper Tellico Off-Highway Vehicle Area on the Tusquitee Ranger District of the Nantahala National Forest. The entire watershed is in public ownership except for several small private inholdings, one of which is along a middle reach of Tipton Creek. Currently the Forest Service is evaluatingalternatives for future management of the Off-Highway Vehicle Area because of significant resources damage, particularly to streams and resident brook trout populations. This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream.
Located in Projects / 2006 - 2018 Projects / 2010 Projects
Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
Tipton Creek is located within the Upper Tellico Off-Highway Vehicle Area on the Tusquitee Ranger District of the Nantahala National Forest. The entire watershed is in public ownership except for several small private inholdings, one of which is along a middle reach of Tipton Creek. Currently the Forest Service is evaluatingalternatives for future management of the Off-Highway Vehicle Area because of significant resources damage, particularly to streams and resident brook trout populations. This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream.
Located in Funded Projects / EBTJV Projects
Restoring Brook Trout to Aaron Run, Maryland
Project will remediate chronic habitat and water quality problems resulting from historic acid mine drainage (AMD) sources and agricultural practices in four miles of Aaron Run, allowing for the reestablishment of an extirpated native brook trout population. Remediation will also benefit brook trout habitat in the lower Savage River and the upper North Branch Potomac River, and reestablish historic population connections.
Located in Projects / 2006 - 2018 Projects / 2007 Projects