Hathaway Brook Dam Removal and Stream Restoration in MA
-
The primary goal of this project is to restore natural stream conditions and stream connectivity within Hathaway Brook, thereby enhancing habitat value for existing aquatic species. One barrier will be removed, restoring access to 3,000 feet of stream. The project will reestablish continuous flow and natural sediment transport regimes, and restore geomorphic processes within the channel.
Located in
Funded Projects
/
EBTJV Projects
-
Mass: Climate Smart Agriculture Program /Agricultural Environmental Enhancement Program (AEEP)
-
This grant program is for the implementation of agricultural conservation practices that reduce or prevent negative impacts to the Commonwealth's natural resources that may result from agricultural practices, while maintaining sustainability and productivity of the agricultural operation. Part of this incentivizes producers to proactively address risks and strengthen their economic and environmental resiliency as they adapt to a changing climate. Agricultural operations engaged in production agriculture for commercial purposes as defined in Massachusetts law M.G.L c. 128, Sec. 1A. Applicant must own, or be a Co-Applicant with the owner of the agricultural operation.
Located in
The Story of Wild Brook Trout
/
Landowner Resources
-
NRCS Conservation Reserve Enhancement Program (CREP)
-
USDA Natural Resource Conservation Service (NRCS) Farm Service Agency (FSA) Conservation Reserve Enhancement Program (CREP) provides annual rental payments and cost-share assistance to establish resource conserving vegetation on eligible farmland and pastures.
Located in
The Story of Wild Brook Trout
/
Landowner Resources
-
NRCS EQIP Program
-
USDA Natural Resource Conservation Service (NRCS) Farm Service Agency (FSA)Environmental Quality Incentives Program (EQIP) pays for agricultural practices on a cost-share basis for items like fencing, water facilities, etc. that have a positive impact on environmental conditions.
Located in
The Story of Wild Brook Trout
/
Landowner Resources
-
Partners for Fish and Wildlife Program
-
Provides technical and financial assistance to landowners to restore wildlife habitat (including riparian, stream, and wetlands restoration)
Located in
The Story of Wild Brook Trout
/
Landowner Resources
-
Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts
-
This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.
Located in
Projects
/
2006 - 2018 Projects
/
2008 Projects
-
Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts
-
This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.
Located in
Funded Projects
/
EBTJV Projects
-
RIVER WALKS AND SALTER BROOK TROUT
-
A series of public events celebrating salter brook trout conservation and the publication of a new book, Salter by Thomas Pero, is slated for the fall.
Located in
News & Events
/
News Inbox
-
Thunder Brook Dam Removal, Chesire, Massachusetts
-
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.
Located in
Projects
/
2006 - 2018 Projects
/
2011 Projects
-
Thunder Brook Dam Removal, Chesire, Massachusetts
-
This project seeks to restore natural riverine functions and values to Thunder Brook, a tributary to the South Branch of the Hoosic River. In its current condition, an aging dam and failing culvert fragment this valuable coldwater stream and prevent fish passage between the Hoosic and the high quality headwaters of Thunder Brook on Mount Greylock. This project will remove 2 fish passage barriers and open 2.4 miles of stream for brook trout passage. The project will also re-establish the river's natural flow regime, improve sediment dynamics and water quality, and restore natural clean gravel and cobble necessary for brook trout and other species of interest.