-
Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts
-
This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.
Located in
Projects
/
2006 - 2018 Projects
/
2008 Projects
-
Restoration of North Branch of the Hoosic River, Removal of the Briggsville, Massachusetts
-
This project will remove the Briggsville Dam in Clarksburg, Massachusetts to restore and reconnect approximately 30 miles of habitat in the North Branch Hoosic River. Removal of the dam will eliminate a barrier to the movement of aquatic and riparian species, re-establish the river's natural flow regime, improve water quality, improve the temperature regime for coldwater species, and restore natural clean gravel and cobble necessary for brook trout.
Located in
Funded Projects
/
EBTJV Projects
-
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
-
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in
Projects
/
2006 - 2018 Projects
/
2012 Projects
-
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
-
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in
Funded Projects
/
EBTJV Projects
-
Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
-
Tipton Creek is located within the Upper Tellico Off-Highway Vehicle Area on the Tusquitee Ranger District of the Nantahala National Forest. The entire watershed is in public ownership except for several small private inholdings, one of which is along a middle reach of Tipton Creek. Currently the Forest Service is evaluatingalternatives for future management of the Off-Highway Vehicle Area because of significant resources damage, particularly to streams and resident brook trout populations. This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Restoring Aquatic Organism Passage within Tipton Creek, North Carolina
-
Tipton Creek is located within the Upper Tellico Off-Highway Vehicle Area on the Tusquitee Ranger District of the Nantahala National Forest. The entire watershed is in public ownership except for several small private inholdings, one of which is along a middle reach of Tipton Creek. Currently the Forest Service is evaluatingalternatives for future management of the Off-Highway Vehicle Area because of significant resources damage, particularly to streams and resident brook trout populations. This project will be the first of several designed to reconnect and restore brook trout habitat and populations within the Tellico River watershed. It will remove one barrier on Tipton Creek in the Upper Tellico River Watershed to reconnect approximately 4 miles of stream.
Located in
Funded Projects
/
EBTJV Projects
-
Restoring Brook Trout to Aaron Run, Maryland
-
Project will remediate chronic habitat and water quality problems resulting from historic acid mine drainage (AMD) sources and agricultural practices in four miles of Aaron Run, allowing for the reestablishment of an extirpated native brook trout population. Remediation will also benefit brook trout habitat in the lower Savage River and the upper North Branch Potomac River, and reestablish historic population connections.
Located in
Projects
/
2006 - 2018 Projects
/
2007 Projects
-
Restoring Brook Trout to Aaron Run, Maryland
-
Project will remediate chronic habitat and water quality problems resulting from historic acid mine drainage (AMD) sources and agricultural practices in four miles of Aaron Run, allowing for the reestablishment of an extirpated native brook trout population. Remediation will also benefit brook trout habitat in the lower Savage River and the upper North Branch Potomac River, and reestablish historic population connections.
Located in
Funded Projects
/
EBTJV Projects
-
Restoring Browns Run Fish Passage, Barr Township, Pennsylvania
-
This project will open the headwaters of Browns Run, a tributary to the West Branch of the Susquehana River, to native brook trout passage and improve Browns Run brook trout habitat. One dam will be removed on Browns Run to open 1 mile of habitat and reconnect currently fragmented native brook trout populations in the headwaters of the basin.
Located in
Projects
/
2006 - 2018 Projects
/
2010 Projects
-
Restoring Browns Run Fish Passage, Barr Township, Pennsylvania
-
This project will open the headwaters of Browns Run, a tributary to the West Branch of the Susquehana River, to native brook trout passage and improve Browns Run brook trout habitat. One dam will be removed on Browns Run to open 1 mile of habitat and reconnect currently fragmented native brook trout populations in the headwaters of the basin.
Located in
Funded Projects
/
EBTJV Projects