Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

14 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Project Pascal source code 2014 Restoring Habitat Connectivity, Machias & Saint Croix River tributary streams ME: EBTJV&NFHAP
Downeast Lakes Land Trust (DLLT) will continue its work with partners to restore brook trout habitat on priority streams in the headwaters of the Machias River and the west branch of the Saint Croix River by removing passage barriers.
Located in Projects / 2006 - 2018 Projects / 2014 Projects
Bipartisan Infrastructure Bill and brook trout
How infrastructure funding can help brook trout.
Located in News & Events / News Inbox
Brook trout can move a little freer in Maryland's Blue Lick Watershed
Trout Unlimited recently replaced a barrier on a tributary to Blue Lick Run, in the Savage River Watershed, Avilton Maryland.
Located in News & Events / News Inbox
Person Troff document Calvert, Patrick
Located in Practitioners (individuals)
File Carloe Brook Fish Passage Restoration, ME_FY11 Project
The project replaced an undersized and failing stream crossing on Carloe Brook a major tributary to Clifford Lake that has wild brook trout. This stream crossing currently limits passage for trout and other aquatic organisms. The current crossing is also a significant sediment source due to improper construction and overtopping. The crossing was replaced with a 1.2 bankfull open bottom arch culvert (15ft wide) designed to allow passage at all flows.
Located in Projects / Project Completion Reports
Celebrating 1,000 Culverts
THE U.S. FOREST SERVICE AND ITS MANY PARTNERS ARE BUILDING BETTER CULVERTS TO OPEN WATERWAYS FOR FISH TO GROW, REPRODUCE AND SURVIVE, TO IMPROVE THE RESILIENCY OF ROADS TO FLOODING, AND TO PROTECT TRANSPORTATION INFRASTRUCTURE FOR COMMUNITIES
Located in News & Events / News Inbox
For municipalities. Learn more about our Culvert Replacement Municipal Assistance Grant Program. There are approximately 25,000 culverts and small bridges in Massachusetts - the majority of which are undersized. Culverts that are too small can be barriers to fish and wildlife movement and cause flood hazards for communities. Massachusetts regulations call for culverts to meet the Stream Crossing Standards to help protect our natural resources and our communities. Find out here how the Division of Ecological Restoration (DER) can help your community with culvert replacements that meet these Standards and learn more about our Culvert Replacement Municipal Assistance Grant Program.
Located in The Story of Wild Brook Trout / Landowner Resources
This handbook is intended to encourage the proper design and implementation of all new stream crossings in Georgia to maintain stream connectivity, improve stream health, provide for public safety, improve water quality, and make communities more resilient. Originally published in 2012, this 2021 update represents the work of 18 authors drawn from State and Federal Agencies, NGOs, academia, and private firms.
Located in Science and Data / Aquatic Organism Passage I&A and state design guidelines / State Sream Crossing Guidelines
Project Harpeth River Restoration
As part of a jointly funded project via the National Fish Passage Program, the totality of this project is removing a lowhead dam and restoring the immediate area to riffle/run habitat for the benefit of improved water quality and native fish habitat in the Harpeth River, TN.
Located in Funded Projects / SARP Projects W2B
File Troff document Harvey’s Lake Dam Removal, South Peacham Brook, Barnet, Vermont
Removal of the Harvey's Lake dam improves natural flow regimes, free-flowing river conditions, water quality and temperature, sediment release and transport, and connectivity to 27 miles within the Stevens River watershed. Floodplain restoration and large wood installations provides additional habitat in South Peacham Brook. The project cost is $861,750 and the estimated socioeconomic benefit is $14.7 million.
Located in Projects / 2019 Projects