Skip to content. | Skip to navigation

Sections
Personal tools
You are here: Home

Search results

31 items matching your search terms.
Filter the results.
Item type


















New items since



Sort by relevance · date (newest first) · alphabetically
Brook trout can move a little freer in Maryland's Blue Lick Watershed
Trout Unlimited recently replaced a barrier on a tributary to Blue Lick Run, in the Savage River Watershed, Avilton Maryland.
Located in News & Events / News Inbox
Celebrating 1,000 Culverts
THE U.S. FOREST SERVICE AND ITS MANY PARTNERS ARE BUILDING BETTER CULVERTS TO OPEN WATERWAYS FOR FISH TO GROW, REPRODUCE AND SURVIVE, TO IMPROVE THE RESILIENCY OF ROADS TO FLOODING, AND TO PROTECT TRANSPORTATION INFRASTRUCTURE FOR COMMUNITIES
Located in News & Events / News Inbox
EBTJV's 2021 habitat projects to connect over 6 stream miles, reduce sedimentation, improve brook trout resiliency to climate change
The US Fish and Wildlife Service has awarded $173,333 in funding for EBTJV partners through the National Fish Habitat Partnership Program in 2021. These projects bring an additional $669,887 in partner contributions for a partner:NFHAP ratio of 3.9:1.
Located in News & Events / News Inbox
Bipartisan Infrastructure Bill and brook trout
How infrastructure funding can help brook trout.
Located in News & Events / News Inbox
File D source code Culvert Replacement and Stream Restoration in Wolfden Run, Garrett County, Maryland
This project, completed in 2021, enhanced 3 miles of in-stream habitat and restored upstream fish passage to 2.76 miles of Brook Trout habitat, reducing habitat fragmentation in the Upper Potomac River watershed. The project cost $189,753 and the estimated socioeconomic benefit is $1.5 million.
Located in Projects / 2019 Projects
Project Pascal source code 2014 Restoring Habitat Connectivity, Machias & Saint Croix River tributary streams ME: EBTJV&NFHAP
Downeast Lakes Land Trust (DLLT) will continue its work with partners to restore brook trout habitat on priority streams in the headwaters of the Machias River and the west branch of the Saint Croix River by removing passage barriers.
Located in Projects / 2006 - 2018 Projects / 2014 Projects
Culvert Replacement and Instream Habitat Restoration in the Nulhegan River Vermont
This project will replace three fish passage barriers and install approximately 3 miles of chop and drop instream restorations on the East Branch of the Nulhegan River and its tributaries.
Located in Projects / 2006 - 2018 Projects / 2012 Projects
Restoring Aquatic Organism Passage within Wolf Laurel Branch, NC
This project will replace the existing double culverts with a bottomless structure to provide passage for brook trout and native nongame species. Replacement of these culverts will eliminate all artificial barriers within the Sand Creek drainage and reconnect existing populations of southern strain brook trout within approximately 2 miles of suitable habitat.
Located in Projects / 2006 - 2018 Projects / 2012 Projects
Marshall Brook Culvert Replacement, Hancock County, Maine
This project will replace two existing undersized, improperly set round culvert inhibiting fish passage at the road / stream crossing of Marshall Brook with the Seal Cove Road in Southwest Harbor, Maine with an open bottom culvert. This will provide 4 miles of passage and reconnect a historic sea run brook trout stream with the estuary at Bass Harbor.
Located in Projects / 2006 - 2018 Projects / 2011 Projects
Upper Shavers Fork Aquatic Passage Project, West Virginia
This project seeks to restore habitat linkages between two spawning tributaries and the mainstem of Upper Shaver's Fork between Cheat Bridge and Spruce, West Virginia. Poor tributary-mainstem connections continue to threaten the sustainability and expansion of brook trout populations in genetically isolated tributaries as well as those in the mainstem of Upper Shaver's Fork. To address these problems, two blocking railroad culverts will be replaced with passage-friendly culverts to provide over 8 miles of passage for brook trout.
Located in Projects / 2006 - 2018 Projects / 2011 Projects